House Update #17: Second floor

The house is moving right along. The framing crew has been working continuously (thanks to the nice weather), and Big Man has been up there every day working as well.  He is working on the basement framing, organizing and moving all the materials, and basically just doing what needs to be done. All that hard work means the second floor is framed, about 75 % of the roof trusses are installed, and we can really see the entire house structure coming together. Here are some pictures!

The front of the house. The roofline is now visible!
The front of the house. The roofline is now visible!
View of the house from downhill, where you can see the walkout basement
View of the house from downhill, where you can see the walkout basement
View of the house from the uphill side
View of the house from the uphill side
View from the master bath windows
Standing in the master bath, looking out the windows
My favorite picture, the view out the master bedroom window
My favorite picture, the view out the master bedroom window

Thanks for following along with us!

Advertisements

Comments are welcome, please participate!

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s